Research of the area of possible shift loaded skip barycentre of electromagnetic lifting installation

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Publishing House of the KarSU named after E.A.Buketov

Abstract

The application of existing outdated, inefficient mine winders has increased the cost of minerals several times. The solution to this problem is the creation of an electromagnetic lift installation. With this setup transportation of much greater weight is possible, spending less energy resources in comparison with existing technologies. According to the objectives of creation the electromagnetic lifting installation it is necessary to carry out the analysis and reveal the most loaded periods of work of skips of mine and career electromagnetic lifting installations. While determining the constructive parameters of skips it is necessary to consider the local external forces created by reactions of electromagnetic forces of electromagnets of the directing devices.

Description

Citation

Research of the area of possible shift loaded skip barycentre of electromagnetic lifting installation/A.A.Aikeyeva , B.A.Zhautikov, F.B.Zhautikov, P.A.Mukhtarova //Eurasian Physical Technical Journal. - 2014.- Vol. 11, No.1(21).-P.62-69

Collections

Endorsement

Review

Supplemented By

Referenced By