Processing of Waste from Enrichment with the Production of Cement Clinker and the Extraction of Zinc
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Materials
Abstract
This paper presents studies on the processing of enrichment tailings as a component of a
raw mixture in order to obtain cement clinker, with simultaneous distillation of zinc. Thermodynamic studies were carried out in the temperature range of 600–1600 C using the software application “HSC Chemistry 6” developed by the metallurgical company Outokumpu (Finland). As a result of the conducted studies, we found that zinc contributes to the intensification of mineral formation of cement clinker. In particular, it was found that the formation of belite is possible in the temperature range from 990.7 to 1500 C with Gibbs energy values of 0.01 and 323.8 kJ (which is better than the standard process by 11.4 kJ), respectively; the formation of alite is possible in the temperature range
from 982.9 to 1500 C with Gibbs energy values of 0.05 and 402.1 kJ (better than the standard process by 11.4 kJ), respectively; the formation of tricalcium aluminate is thermodynamically possible in the temperature range from 600 C at DGT
o = 893.8 kJ to 1500 C at DGT o = 1899.3 kJ (better than the standard process by 1570.1 kJ), respectively; and the formation of four calcium aluminoferrite is possible in the temperature range from 600 C at DGT o = 898.9 kJ to 1500 C at
DGT o = 1959.3 kJ (better than the standard process by 1570.2 kJ), respectively, with simultaneous distillation of zinc into a gaseous state for its further capture.
Description
Citation
Processing of Waste from Enrichment with the Production of Cement Clinker and the Extraction of Zinc/Kolesnikov A. [et al.] // Materials. - 2022. - Vol.15, 324. - pp.1-18.